We are offering a range of Gantry Cranes which are used for overhead Mild Steel Material handling where existing columns do not have overhead brackets to hold up gantry and rails. These are also used in the open places where columns cannot be accommodated.
Holding profound knowledge in the Mild Steel Material handling equipment manufacturing industry, our company is considered as the pioneering manufacturer, supplier of Semi Goliath Crane. Precisely engineered in compliance with industrial standards using advanced technology, we are offering these goliath cranes in a wide range of specifications. Suitable to be used in the construction industry, shipping yards, road sides and mines, we are offering Semi Goliath Crane to the clients without any delay.
SEMI GOLIATH CRANES We are offering a range of Gantry Cranes which are used for overhead Mild Steel Material handling where existing columns do not have overhead brackets to hold up gantry and rails. These are also used in the open places where columns can not be accommodated.
Although adequate care has been taken while designing the crane and various safety Features provided, the overall safety and maintenance of cranes depends to a large extent on the skill of the operator.
A trained and efficient operator could contribute to a large extent in reducing maintenance cost and prolong the life of the crane by skilful manipulation of the controls allowing the motors to accelerate gradually to avoid heavy impacts and prevent high current draw The operator shall avoid swinging the loads and shall coase the crane to stop rather than causing sudden stopping of the motor and hard braking which result in Skidding of brakes.
Therefore, it is absolutely essential that operator is given proper training in handing the crane and is duly certified by a qualified person before he is permitted to handle the crane independently t may be ensured that no one should be in the cab with the crane operator except when under training or on maintenance duties Likewise, no person shall be on the bridge walkway or on the trolley during normal operation. 12 Operating Procedure
High load carrying capability
Less maintenance
Sturdy structure